PHASE 3 PROCEEDINGS (1st) BITUMEN CONSERVATION REQUIREMENTS PROCEEDING NO. 1333566 AND APPLICATION NO. 1067996, 1283132, 1290220, 1294457, & 1299696
This page provides access to documents filed with or issued by the Board in relation to Phase 3 Proceedings - 1st Interim under the Board's Bitumen Conservation Requirements affecting Gas Production in Oil Sands Areas
DECISION AND ORDERS FROM THIS PROCEEDING
Decision 2004-045: Phase 3 Proceedings Under Bitumen Conservation Requirements and Applications for Approval to Produce Gas in the Athabasca Wabiskaw-McMurray Area (Released: June 8, 2004) Note: There are 2 tables in the PDF file. For your convenience we are providing a link to Excel versions of the Tables that you can download: -- Table 1 (Excel format) -- Table 2 (Excel format)
Interim Shut-In Order 04-001
Interim Shut-In Order 04-002 - Table 1 (Excel format)
Responses to Requests for Confirmation of Shut-in
- Letter dated July 19, 2004, from Anadarko Canada Corporation
- Letter dated July 19, 2004, from Royston S. Baay
- Letter dated July 12, 2004, from Bonavista Energy Trust
- E-mail dated July 12, 2004, from BP Canada
- Letter dated July 15, 2004, from Calpine Canada
- Letter dated July 12, 2004, from Calpine Canada
- Letter dated July 12, 2004, from Canadian Natural Resources Limited
- Letter dated July 23, 2004, from Chevron Texaco
- Letter dated July 16, 2004 from Conoco Phillips Canada
- Letter dated July 12, 2004, from Devon Canada Corporation
- Letter dated September 14, 2004, from EnCana Corporation
- Letter dated August 3, 2004, from EnCana Corporation
- Letters dated July 29, 2004, from Husky Oil Operations Limited
- Letter dated July 8, 2004, from ISH Energy Ltd.
- Letter dated July 20, 2004, from Opti Canada Inc.
- Letter dated July 27, 2004, from Paramount Energy Trust
- Letter dated July 12, 2004, from Paramount Energy Trust
- Letter dated July 8, 2004, from Paramount Resources
- Letter dated July 19, 2004, from Shell Canada Limited
- Letter dated July 12, 2004, from Stylus Exploration Inc.
- E-mail dated July 29, 2004, from Superman Resources Inc.
- Letter dated July 12, 2004, from Superman Resources Inc.
- E-mail dated July 29, 2004, from Talisman Energy Inc.
- Letter dated July 12, 2004, from Talisman Energy Inc.
- E-mail dated August 3, 2004, from Viking Energy Ltd.
- Letter dated July 12, 2004, from Viking Energy Ltd.
See also: News Release plus Backgrounders 2004-06-08 (NR2004-21) EUB Decision Protects Bitumen for Future Generations of Albertans
Letter dated June 8, 2004, from EUB to parties on attached list (release of Decision 2004-045)
POSTING OF MATERIAL ON EUB WEB SITE
PRELIMINARY MATTERS
Requests and Submissions to EUB Regarding Preliminary Matters
- Letter dated January 7, 2004, Bennett Jones on behalf of Paramount Energy Trust to EUB
- Letter dated January 12, 2004, from Paramount Energy Trust to EUB
- Letter dated January 19, 2004, from Paramount Energy Trust to EUB
- Letter dated January 19, 2004 from Thackray Burgess LLP on behalf of Canadian Natural Resources Limited to EUB
- Letter dated January 19, 2004, from EnCana Corporation, Devon Canada Corporation, Paramount Energy Trust, and BP Canada Energy Company to EUB
- Letter dated January 28, 2004, from Husky Oil Operations Limited to EUB
- Letter dated January 30, 2004, from Bennett Jones LLP on behalf of Devon Canada Corporation to EUB
- Letter dated January 30, 2004, from EUB Staff Submission Group to EUB
- Letter dated January 30, 2004, from Giant Grosmont Petroleums Ltd. to EUB
- Letter dated January 30, 2004, from Paramount Energy Trust to EUB
- Letter dated January 30, 2004, from Paramount Resources to EUB
- Letter dated January 30, 2004, from PrimeWest Energy Inc. to EUB
- Letter dated January 30, 2004, from Rowbotham Law Office on behalf of Stylus Exploration Inc. to EUB
- Letter dated January 30, 2004, from ISH Energy Ltd. to EUB
- Letter dated January 30, 2004, from Imperial Oil Resources, Japan Canada Oil Sands Limited, Nexen Canada Ltd., and Petro-Canada
- Letter dated February 3, 2004, from Macleod Dixon on behalf of EnCana Corporation to EUB
- Letter dated February 9, 2004, from Thackray Burgess on behalf of Canadian Natural Resources Limited to EUB
- Letter dated February 12, 2004, from Paramount Energy Operating Corp. to EUB
- Letter dated February 13, 2004, from Macleod Dixon on behalf of EnCana Corporation to EUB
- Letter dated February 18, 2004, from EUB Staff Submission Group to EUB (regarding distribution of filed material)
- Letter dated February 18, 2004, from EUB Staff Submission Group to EUB (respecting a letter dated February 12, 2004, from Paramount to EUB)
- Submission dated February 19, 2004, from CORE - The Confederations of Regions Political Party of Alberta
- Letter dated February 20, 2004, from Paramount Resources to EUB
- Letter dated February 26, 2004, from Canadian Natural Resources Limited to EUB
- Letter dated February 27, 2004, from Borden Ladner Gervais LLP on behalf of ConocoPhillips Canada Resources Corp. to EUB Counsel (Perkins and Larder)
- Letter dated March 1, 2004, from Paramount Energy Operating Corp. to EUB
- Letter dated March 2, 2004, from EUB Staff Submission Group to EUB and Interested Parties (regarding wells involved in Decision 2000-22 Gulf Surmont Decision)
- Letter dated March 2, 2004, from Calpine Canada Resources Company to EUB
- Letter dated March 8, 2004, from Fraser Milner Casgrain LLP on behalf of BP Canada Energy Company to EUB
EUB Responses to Preliminary Matters Raised
- Letter dated January 20, 2004, from EUB to Bennett Jones on behalf of Paramount Energy Trust>
- Letter dated January 26, 2004, from EUB to parties on attached list
- Letter dated January 28, 2004, from EUB to Paramount Energy Trust
- Letter dated January 29, 2004, from EUB to Paramount Energy Trust
- Letter dated February 4, 2004, from EUB to parties on attached list
- Letter dated February 9, 2004, from EUB to Macleod Dixon on behalf of EnCana Corporation
- Letter dated February 11, 2004, from EUB to Thackray Burgess on behalf of Canadian Natural Resources Limited
- Letter dated February 13, 2004, from EUB to Macleod Dixon on behalf of EnCana Corporation
- Letter dated February 19, 2004, from EUB to Interested Parties
- Letter dated February 23, 2004, from EUB to Paramount Energy Trust (regarding review request)
- Letter dated March 3, 2004, from EUB to Participating Parties and Counsel
- Letter March 8, 2004, from EUB to Interested Parties
- Letter dated March 8, 2004, from EUB to Thackray Burgess on behalf of Canadian Natural Resources Limited, Macleod Dixon LLP on behalf of EnCana Corporation, and Bennett Jones LLP on behalf of Devon Canada Corporation and Giant Grosmont Petroleums Ltd.
- Letter dated March 9, 2004, from EUB to Fraser Milner Casgrain LLP and Nexen Canada Ltd.
HEARING
EUB
- Notice of Hearing (Posted February 13, 2004)
- Letter dated February 23, 2004, from EUB to EUB Staff Submission Group
- Letter dated February 24, 2004, from EUB to Parties on the Attached List
- Letter dated February 25, 2004,, from EUB to Parties on Attached List (List as Attached to EUB Letter of Feb 24, 2004), regarding allocation of time for cross-examination
- Letter dated Feburary 26, 2004, from EUB to Parties on attached list (delay of commencement of hearing to March 10, 2004)
- Letter dated March 12, 2004, from EUB to Parties on the Attached List
- Letter dated March 16, 2004, from EUB to Parties on the Attached List
- Letter dated March 25, 2004, from EUB to Parties on the Attached List (respecting time allocations for final argument)
- List of Exhibits
- Exhibit A-1: Package of:
- Notice of Interim Hearing, Proceeding No. 1333566 and Applications No. 1067996, 1283132, 1290220, 1294457, and 1299696
- AD-1 form respecting distribution of Notice of Interim Hearing
- Letter dated February 26, 2004, from EUB to Parties on the Attached List (delay of filing date to March 3, 2004, and hearing date to March 10, 2004)
- Letter dated February 25, 2004, from EUB to Parties on the Attached List
- Letter dated January 2, 2004, from EUB to All Oil, Gas, and Oil Sands Operators
- Letter dated December 17, 2003 from EUB to All Oil, Gas, and Oil Sands Operators
- General Bulletin GB 2003-28 Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray (Exhibit A-2)
- General Bulletin GB 2003-16 Proposed Conservation Policy Affecting Gas Production in Athabasca Wabiskaw-McMurray Oil Sands Areas (Exhibit A-3)
- General Bulletin GB 2003-12 Gas Production in Oil Sands Areas (Exhibit A-4)
- Interim Directive ID 99-1 Gas/Bitumen Production in Oil Sands Areas, Application, Notification, and Drilling Requirements (including all amendments) (Exhibit A-5)
- EUB Order No. MU 2096 for the Newby Field (Exhibit A-6)
- Logs for wells AA/9-6-100-13 W4 and 00/12-28-99-14 W4 (Exhibit A-7)
- Logs for wells 00/14-20 and 00/8-21-83-5 W4M (Exhibit A-8)
Hearing Submissions (in alphabetical order by company)
Bonavista Petroleum
BP Canada Energy Company
-
- Submission dated February 23, 2004, from BP to EUB (Exhibit C-2)
- Letter dated March 19, 2004, from Fraser Milner Casgrain LLP on behalf of BP Canada Energy Company, with attached curriculum vitae for BP Canada witnesses D. Doolan, E. Mathison, J. Wilhelm, and B. Hughes (Exhibit C-3)
- Letter dated March 23, 2004, from Fraser Milner Casgain LLP on behalf of BP Canada, to EUB, with attachments of Exhibit C-4, Production plots for 7-14 and 10-16-77-8 W4, and Exhibit C-5, Wabiskaw-McMurray DP v. Time Plot
Calpine Canada Resources Company
Canadian Natural Resources Limited
- Letter dated February 10, 2004, from Thackray Burgess on behalf of Canadian Natural Resources Limited to EUB (Exhibit E-1)
- Submission dated February 23, 2004, from CNRL to EUB (Exhibit E-2) (45 MB Zip)
- Reply submission dated March 3, 2004, from Canadian Natural Resources Limited (Exhibit E-3)
- Letter dated March 4, 2004, from Thackeray Burgess on behalf of Canadian Natural Resources Limited to EUB (regarding additional wells for review) (Exhibit E-4)
- Letter dated March 9, 2004, from Canadian Natural Resources Limited to EUB (CNRL Exhibit E-5, Curriculum Vitae of Lyle Stevens and Jane MacTaggart)
- Letter dated March 11, 2004, from Canadian Natural Resources Limited to EUB
- Excerpt from RGS Gas Evaluation and Delineation Maps (Exhibit E-6)
- EUB Pool Order for Leismer Wabiskaw-McMurray A Pool, January 1, 2004 (Exhibit E-7)
- Document entitled Communication Assessment 3, Wbsk B Valley-fill & Wbsk C Sd Gas, McM Chnl/C Chnl Bitumen UTM Zone 12, NAD83, Jan24/04 (Exhibit E-8)
- EUB Pool Order for Leismer Wabiskaw-McMurray A Pool, March 1, 2004 (Exhibit E-9)
- EUB Pool Order for Clyden McMurray Y Pool, December 1, 2003 (Exhibit E-10)
- EUB Pool Order for Clyden McMurray Y Pool, March 1, 2004 (Exhibit E-11)
- EUB Pool Order for Clyden McMurray AA Pool, December 1, 2003 (Exhibit E-12)
- EUB Pool Order for Clyden McMurray AA Pool, March 1, 2004 (Exhibit E-13)
- Information for the Thornbury McMurray G2G Pool (Exhibit E-14)
- Newby McMurray B Pressure Review (Exhibit E-15)
- Map showing virgin pressures (Exhibit E-16)
- Letter dated March 11, 2004, from CNRL to EUB (Exhibit E-17)
- Undertaking, March 24, 2004, - Line 1820 (Exhibit E-18)
- Figure 3: TVDSS Perforated intervals vs RGS Gas Evaluation and Delineation Data .xls - March 25, 2004 Correction (Exhibit E-19)
Devon Canada Corporation
- Letter dated February 9, 2004, from Devon Canada Corporation and Giant Grosmont Petroleums Ltd. to EUB (Exhibit F-1)
- Letter dated February 10, 2004, from Devon Canada Corporation to EUB (Exhibit F-2)
- Submission dated February 23, 2004, from Devon and Giant Grosmont to EUB (Exhibit F-3)
- Reply Submission dated March 3, 2004, from Devon and Giant Grosmont to EUB (Exhibit F-4)
- Map showing pools and bitumen distribution (Exhibit F-5)
- Map showing distribution and thickness of bitumen (Exhibit F-6)
- EUB Pool Order and List of Wells (Exhibit F-7)
- Package of maps and well logs (Exhibit F-8)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 1 (Exhibit F-9)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 13 (Exhibit F-10)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 26 (Exhibit F-11)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 30 (Exhibit F-12)
- Two-page document with first page labeled Petro-Canada 2003, and second page showing distance from Petro-Canada wells to closest producers (Exhibit F-13)
- Curriculum Vitae for Devon and Giant Grosmont witnesses D. Spencer and R. Watson (Exhibit F-14)
- Portion of Static Gradient Pressure Test for 16-36-82-8 W4 (Exhibit F-15)
- Well logs for 7-25-82-8 W4, and 6-29 and 6-32-82-7 W4 (Exhibit F-16)
- Map showing pool interpretations in all or portions of Townships 82 and 83, Ranges 6 and 7 W4 (Exhibit F-17)
EnCana Corporation
- Gas Production Application No. 1299696, including related EUB letter and supplementary information filed (Exhibit G-3)
- Letter dated February 9, 2004, from Macleod Dixon LLP on behalf of EnCana Corporation to EUB (Exhibit G-1)
- Submission dated February 23, 2004, from EnCana to EUB (Exhibit G-2) (188 MB Zip)
- Excerpt from transcript from Alberta Energy and Utilities Board Leismer Field and Chard Area Proceedings Respecting Specified Gas Production Applications (2002) (Exhibit G-4)
- Geolog Methodology for Reservoir Calculations (Exhibit G-5)
- Comparison of RGS-Tabulated Bitumen Thickness Values Versus Actual Core-Measured Values, Ells-Birch Region (Exhibit G-6)
- Four Example Situations of Bitumen Evaluation (Exhibit G-7)
- Cross-section of 11 wells, 100/11-34-92-18 W4 through to lAA/13-28-95-16 W4 (Exhibit G-8)
- Correlations of the Wabiskaw A & C sand tops as reported in the RGS Report 2003A Versus alternative correlation shown in mauve colour (Exhibit G-9)
- Wabiskaw Bitumen Thickness Between Water Legs (Average Thickness = 11.1 m) Ells Area (Exhibit G-10)
- Cross-section of 12 wells, 100/11-7-99-14W4 to 100/10-5-98-14W4, log and core data for lAA/11-22-99-14W4, log data for lAA/2-29-99-14W4, map entitled Net Bitumen Thickness in the McMurray Channel, and map entitled Net Bottom Water in the McMurray Channel (Exhibit G-11)
- Package of well log data (Exhibit G-12)
- Log and well data for 00/10-36-80-9W4/0 (Exhibit G-13)
- Birch (Tar) and Ells Areas, Submission of EnCana Corporation, Dated: March 17, 2004 (Exhibit G-14)
- Curriculum Vitae for EnCana witnesses D. Haugen, D. McPhee, B. Falez, J. Wilhelm, and P. Putnam (Exhibit G-15)
- EnCana Corporation Corrections to Feb 23, 2004 Evidence Submission Leismer Field (Exhibit G-16)
- EUB Pool Order for Tar Wabiskaw O Pool, annotated (Exhibit G-17)
- Schematic cross-section A-A' (Exhibit G-18)
- Log cross-section A-A' (Exhibit G-19)
- Bitumen pay analysis and core photos, 1AA/02-29-99-14W4 (Exhibit G-20)
- EnCana Leismer Field, Review of Fekete Study, Maximum Differential Pressure Between Wells in Same Pool (Exhibt G-21)
Giant Grosmont Petrolems Ltd.
- Letter dated February 9, 2004, from Devon Canada Corporation and Giant Grosmont Petroleums Ltd. to EUB (Exhibit F-1)
- Letter dated February 10, 2004, from Devon Canada Corporation to EUB (Exhibit F-2)
- Submission dated February 23, 2004, from Devon and Giant Grosmont to EUB (Exhibit F-3)
- Reply Submission dated March 3, 2004, from Devon and Giant Grosmont to EUB (Exhibit F-4)
- Map showing pools and bitumen distribution (Exhibit F-5)
- Map showing distribution and thickness of bitumen (Exhibit F-6)
- EUB Pool Order and List of Wells (Exhibit F-7)
- Package of maps and well logs (Exhibit F-8)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 1 (Exhibit F-9)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 13 (Exhibit F-10)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 26 (Exhibit F-11)
- Package of maps and well logs with first page labeled B Mudstone, Petro-Canada Fig. 7, 23 Feb 04, 30 (Exhibit F-12)
- Two-page document with first page labeled Petro-Canada 2003, and second page showing distance from Petro-Canada wells to closest producers (Exhibit F-13)
- Curriculum Vitae for Devon and Giant Grosmont witnesses D. Spencer and R. Watson (Exhibit F-14)
- Portion of Static Gradient Pressure Test for 16-36-82-8 W4 (Exhibit F-15)
- Well logs for 7-25-82-8 W4, and 6-29 and 6-32-82-7 W4 (Exhibit F-16)
- Map showing pool interpretations in all or portions of Townships 82 and 83, Ranges 6 and 7 W4 (Exhibit F-17)
Husky Oil Operations Limited
ISH Energy Ltd.
Nexen Canada Ltd.
- Letter dated February 9, 2004, from Nexen Canada Ltd. to EUB (Exhibit K-1)
- Submission dated February 23, 2004, from Nexen to EUB (Exhibit K-2)
- Reply submission dated March 3, 2004, from Nexen Canada Ltd. to EUB (Exhibit K-3) (7 MB PDF)
- Material showing Calculation of Additional Wabiskaw C Gas and Well Log Data (Exhibit K-4)
- Log and Core Information for AA/7-26-86-7 W4 (Exhibit K-5)
- Log and Core Information for AA/2-11-86-7 W4 (Exhibit K-6)
- Log and Core Information for AA/16-11-86-7 W4 (Exhibit K-7)
- Curriculum Vitae for Nexen witness L. Skulski (Exhibit K-8)
- Package of 6 well logs for 15-8, 10-8, 10-21, 7-14 and 10-16-77-8 W4 (Exhibit K-9)
- Undertakings dated March 29, 2004, by Nexen, respecting virgin pressures (Exhibit K-10)
- Revised Undertakings dated March 31, 2004, by Nexen, respecting virgin pressures Undertakings dated March 29, 2004, by Nexen, respecting virgin pressures (Exhibit K-11)
Paramount Energy Trust
- Letter dated February 9, 2004, from Paramount Energy Trust to EUB (Exhibit L-1)
- Gas Production Application No. 1067996, including supplementary information filed and related EUB letter dated January 21, 2004 (Exhibit L-4)
- Gas Production Application No. 1290220, including supplementary information filed and related EUB letter dated January 21, 2004 (Exhibit L-5)
- Gas Production Application No. 1294457, including supplementary information filed and related EUB letter dated January 21, 2004 (Exhibit L-6)
- Submission dated February 23, 2004, from Paramount Energy to EUB (Exhibit L-2) (578 MB Zip)
- Reply submission dated March 3, 2004, from Paramount to EUB (Exhibit L-3) (250 MB)
- Replacement for Appendix 1 of Evidence submission of February 23, 2004, filed by Paramount March 1, 2004, to EUB
- Additional information for Corner Q Pool, filed by Paramount March 4, 2004 to EUB
- Curriculum Vitae for Paramount witnesses S. Riddell Rose, B. Norris, R. Hughes, K. Demers, L. McKean, G. Reid, and P. Putnam (Exhibit L-13)
- Revised Errata Submission dated March 25, 2004 (Exhibit L-14)
- Paramount Undertaking No. 1: Page 1897 of Volume 11 of Transcript, respecting the presence of A2 and B2 mudstones and Wabiskaw D shales in certain wells (Exhibit L-16)
- Paramount Undertaking No. 2: Page 2155 of Volume 12 of Transcript, to supply a structure map with contour lines for the A2 sequence and the Wabiskaw C sands (Exhibit L-17)
- EUB Pool Order for Corner McMurray A Pool (Exhibit L-7)
- Package of (1) Corner McMurray A Pool, Paramount Energy Pool Outlines (2) Corner Area Schematic Cross-Section (3) All EUB Corner Mcm A Pool (effective Jan 2, 2004) (Exhibit L-8)
- Package of (1) Leismer Wab-McM A Pool Select Initial Pressures (2) Leismer Wab-McM A Schematic Cross-Section (3) Leismer WbskMcmr A Revision FEB04
(4) Leismer Area Pools SEPT 2003 (5) EUB Pool Order for Leismer McMurray QQQ Pool (6) EUB Pool Order for Chard McMurray B Pool (Exhibit L-9)
- Pressure Information for Hardy Wbsk-Mcmr A (Exhibit L-10)
- Two papers: (1) The Lower Cretaceous Sparky Formation, Aberfeldy Steamflood Pilot, Saskatchewan: A Wave-Dominated Delta? by S. R. Smith (2) Sedimentology, Diagenesis and Thermal Effects on Petrophysical Properties in the Aberfeldy Field, Saskatchewan, by I. Hutcheon and R. Lefebvre (Exhibit L-11)
- Well log for 2-17-78-8W4/0 (Exhibit L-12)
- Curriculum Vitae of Paramount witness G. Bunio (Exhibit L-15)
Petro-Canada
- Letter dated February 9, 2004, from Petro-Canada to EUB (Exhibit M-1)
- Submission dated February 23, 2004, from Petro Canada to EUB (Exhibit M-2) (635 MB Zip)
- Reply submission dated March 3, 2004, from Petro-Canada to EUB (Exhibit M-3) (475 MB Zip)
- Letter dated March 9, 2004, from Petro-Canada to EUB (Exhibit M-5), with attached logs for wells 0017-13 and 0017-14-807w410 (Exhibit M-6)
- Curriculum Vitae for Petro-Canada witnesses G. Stabb and K. Wilde (Exhibit M-7)
- Wells in Corner (Thornbury) and Hangingstone Areas Where Petro-Canada Supports the SSG's Recommendations for Shut-in or Requests for Shut-in Based Upon the Association Cases Identified in the RGS (Exhibit M-11)
- Letter dated March 5,2004, from Petro-Canada to EUB (Exhibit M-4)
- Giant Grosmont cross-section a-a' through 6-12-82-9 W4 to 6-27-82-8 W4, with Petro-Canada annotations (Exhibit M-8)
- Paper entitled Elements of a Stratigraphic Framework for the McMurray Formation in South Athabasca Area, Alberta, by M.J. Ranger and S.G. Pemberton (Exhibit M-9)
- Giant Grosmont cross-section b-b' through 6-12-82-9 W4 to 10-11-82-8 W4, with Petro-Canada annotations (Exhibit M-10)
PrimeWest Energy Inc.
Staff Submission Group
- Staff Submission Group Recommendations for Production Status of Gas Wells Athabasca Wabiskaw-McMurray (In the Matter of Alberta Energy and Utilities Board Bitumen Conservation Requirements Phase 3 Interim Proceeding) (January 26, 2004) (Exhibit H-2)
- Letter dated February 2, 2004, from EUB Staff Submission Group (SSG) to EUB (Correction to SSG Recommendations) (Exhibit H-3)
- Letter dated February 13, 2004, from EUB Staff Submission Group to EUB (Listing of Objections Filed) (Exhibit H-4)
- Letter dated March 2, 2004, from EUB Staff Submission Group to EUB and Interested Parties (regarding wells involved in Decision 2000-22 Gulf Surmont Decision)
- Reply submission dated March 3, 2004, from EUB Staff Submission Group to EUB (Exhibit H-5) (11 MB ZIP)
- Curriculum Vitae for EUB Staff Submission Group Witnesses W. Warren, K. Schuldhaus, B. Fairgrieve, T. Keelan, M Connelly, F. Hein (Exhibit H-6)
- Bitumen Evaluation Data for 16-8-82-12 W4 & Methodology for Bitumen Evaluation for 16-8-82-12 W4 (Exhibit H-7)
- Staff Submission Group undertaking to advise whether core was examined by RGS for the well at 5-15-84-9 W4 (Exhibit H-8)
- Staff Submission Group undertaking respecting pooling of 13-3 and 12-4 wells (Exhibit H-9)
- Schematic - Vertical Association Model (Exhibit H-10)
- SSG Undertaking, Page 4289 of Transcripts; Volume 47 (Exhibit H-11)
- Production plots for 12-11-80-12W4M, Thornbury McMurray XX Pool (Exhibit H-12)
- Superman's Table of Initial Pressures in Thornbury Area, annotated by SSG (Exhibit H-13)
- Pressure information for Kirby Upper Mannville I Pool, annotated by SSG (Exhibit H-14)
- Package of 9 pages of pressure information for various pools (Exhibit H-15)
- Excerpt from Blackrock Application No. 1241564 (Exhibit H-16)
- Hangingstone McMurray LLL: Pressure vs Time Plot (Exhibit H-17)
- Hangingstone Wabiskaw-McMurray E Pool, 14-11-82-8 W4: Operating Day Production Plot (Exhibit H-18)
- Hangingstone Wabiskaw-McMurray E: Pressure vs Time Plot, with SSG annotations (Exhibit H-19)
- Plot labeled Pressure Static Gradient 16-36-82-8 W4 (Exhibit H-20)
- Staff Submission Group Undertaking to provide bitumen net pay maps (Exhibt H-21)
- Staff Submission Group Undertaking to provide copy of Geolog analysis for Paramount's wells 10-27-76-4 W4 and 10-15-76-5 W4 (Exhibit H-22)
- Pressure data for Kirby Upper Mannville I Pool, annotated by SSG (Exhibit H-23)
- AccuCard for 9-13-79-08 W4 (Exhibit H-24)
- Package of well logs: 00/12-21-078-07W4/0, 00/09-13-079-08W4/0, 00/07-14-080-10W4/0, 00/15-26-078-07W4/0, 00/16-34-078-07W4/0, 00/06-36-078-07W4/0, 00/02-10-079-07W4/0, 00/06-30-077-07W4/0 (Exhibit H-25)
- SSG Vertical Association Wells Paramount Objections (Exhibit H-26)
- Map, Leismer Wab McM A Current Pressures, Figure 9, annotated by SSG (Exhibit H-27)
- Newby Wabiskaw-McMurray H Pool, Initial Pressures on file for 14-20 and 11-32 (Exhibit H-28)
- Table with headings labeled CPA_ID, Date, Pressure, On Production Date (Exhibit H-29)
- Figure a, labeled PRODFORM: WBSK_MCMR_H, annotated by SSG (Exhibit H-30)
- Pressure test information for 14-20-83-5 W4M, 11-32-83-5 W4M, 15-15-83-5 W4M (Exhibit H-31)
- Leismer Wabiskaw-McMurray C Pool: Pressure vs Time Plot (Exhibit H-32)
- Well 7-13-79-10W4; Leismer Wabiskaw-McMurray C Pool: Rate vs Cum. Prod Plot (Exhibit H-33)
The supporting material submitted on CD is being made available in several zipped files that you can download.
SSG Supporting Material (SSG CD)
Regional Geological Study and Supporting Files (RGS CD) (Exhibit H-1)
Stylus Exploration Inc.
Superman Resources Inc.
- Letter dated February 9, 2004, Superman Resources Inc. to EUB (Exhibit O-1)
- Submission dated February 23, 2004, from Superman to EUB (Exhibit O-2)
- Submission filed March 1, 2004,, by Superman to EUB (Pressure information for well 7-29-79-12 W4M) (Exhibit O-3)
- Submission filed March 3, 2004, from Superman Resources Inc. to EUB (Exhibit O-4)
- Curriculum Vitae of Superman witnesses M. Webb, L. M. Stasuik, and D. Edge (Exhibit O-5)
|