ERCB Catalogue - Publications: Report Series
These are one-time reports of a technical nature. These reports are assigned a unique number: year-letter (eg. 90-B)
Reports not listed here are out-of-print but may be available through Data & Distribution or viewed in the ERCB Library.
You can also view or print a full version of the Publications Catalogue for pricing information on Print, CD, and Subscription options by product.
|
| ADR Annual Report Appropriate Dispute Resolution Annual Report (Released: July 21, 2011) |
| Report 2011-A Unconventional Gas Regulatory Framework - Jursidictional Review (Released: January 28, 2011) |
| Report 2009-C Risk to Water Wells of Pathogens in Drilling Fluids (October 2009) (Reviewed Literature added November 2009) |
| Report 2009-B Status Report on Enhanced Groundwater Protection Efforts Under Directive 044: Requirements for the Surveillance, Sampling, and Analysis of Water Production in Oil and Gas Wells Completed Above BGWP |
| Report 2009-A Updates to Storage Requirements for the Upstream Petroleum Industry - Discussion Document on Directive 055 (Released: July 30, 2009) |
| Report 2007-A Pipeline Performance in Alberta, 1990-2005 |
| EUB/NEB Report 2005-A Alberta's Ultimate Potential for Conventional Natural Gas |
| Report 2004-A Alberta Single-Well Gas Pool Drainage Area Study |
| Report 2003-A Athabasca Wabiskaw McMurray Regional Geological Study |
| Report 97-A Policy Review of Solution Gas Flaring and Conservation in Alberta |
| Report 92-C Nova Pipeline Failure James River Interchange |
| Report 92-B Review of the Operation of Nova's Pipeline System: Issues and Recommendations |
| Report 91-AA Interim Report The Oslo Project A Commercial Oil Sands Project |
| Report 90-B Field Measurement Program and Gascon2/Risk Approach Volume 1 |
| Report 89-AA Water Recycle Guidelines and Reporting of Water Use Information for In Situ Oil Sand Facilities in Alberta |
| Report D 88-D Alberta Ethane Policy Report on Implementation |
| |
|
Special Reports
The special reports in this section are either:
- published by the ERCB as unnumbered reports (not part of any ERCB numbered report series)
- not published by the ERCB but distributed by ERCB as a convenience to our customers
You can also view or print a full version of the Publications Catalogue for pricing information on Print, CD, and Subscription options by product.
|
| Technical Study of Shelter Versus Evacuation When Faced With a Release of Hydrogen Sulphide |
| Staff Report on the Review of the Sulphur Recovery Guidelines |
| Review of the Battle Lake Watershed Development Planning Project Report of the Multistakeholder Working Group (March 2011) |
| Review of Commingling from the Ardley Coal Zone Review of Commingling from the Ardley Coal Zone in Development Entity No. 1 |
| Report and Recommendations to the ERCB on Public Safety and Sour Gas |
| Public Safety and Sour Gas Final Report Final Report for the EUB's Public Safety and Sour Gas (PSSG) Initiative (March 2007) (Released: June 7, 2007) |
| Public Safety and Sour Gas Implementation Plans |
| Public Safety and Sour Gas Implementation Plans First Progress Report - April 2001 |
| Public Safety and Sour Gas Public Safety and Sour Gas (Provincial Advisory Committee on Public Safety and Sour Gas) |
| Protocol for Increased Coordination Between the EUB and Health Agencies in Alberta Final Report by Recommendation 34 Steering Committee - An initiative of the Provincial Advisory Committee on Public Safety and Sour Gas (May 2007) |
| Pipeline Abandonment A Discussion paper on Technical and Environmental Issues (November 1996) |
| Petroleum Industry Activity in Native Prairie and Parkland Areas: Guidelines for Minimizing Surface Disturbance |
| Oil Sands Regulatory Case Study Big Reserves, Big Responsibility - Developing Alberta's Oil Sands |
| Northeast Calgary Application Consultation Committee (NCACC) Sour Gas Developments Proposed for Northeast Calgary |
| JP05: A Recommended Practice for the Negotiation of Processing Fees A Recommended Practice for the Negotiation of Processing Fees |
| Investigations of Flare Gas Emissions in Alberta |
| Final Report - Outcomes and Recommendations from the Oversight Committee to the ERCB Recommended Practices for Sour Gas Development Planning and Proliferation Assessment (February 2007) (Released: January 2008) |
| EUB Inquiry Gas/Bitumen Production in Oil Sands Areas |
| ERCB Staff Review and Analysis Total E&P Canada Ltd. Surface Steam Release of May 18, 2006 Joslyn Creek SAGD Thermal Operation (Released: February 23, 2010) |
| Compliance Assurance-Enforcement Brochure Enforcement Brochure |
| Celtic Incident Report Celtic Exploration Ltd. Well Servicing Incident: Blowout and Fire August 9, 2005 |
| BP Canada Energy Company Ethane Cavern Well Fires Fort Saskatchewan, Alberta, August/September 2001: EUB Post Incident Report |
| Alberta Ministry of Energy Annual Report |
| Administrative Procedures for Preparing an Environmental Impact Assessment |
| 2005 Spring Conference on Environmental & Occupational Noise |