NOTICE OF APPLICATION
APPLICATION NO. 1451729
TERASEN PIPELINES (CORRIDOR) INC.
SCOTFORD UPGRADER TO TRANS MOUNTAIN PIPELINE TERMINAL
Take Notice that the Alberta Energy and Utilities Board (EUB/Board) received Application No. 1451729. This notice is to advise of the filing of this application. If no submissions are received on or before September 22, 2006, relating to this application, the EUB may continue to process the application without further notice.
Nature of the Application
Terasen Pipelines (Corridor) Inc. (Terasen) has applied pursuant to Part 4 of the Pipeline Act for approval to construct and operate a pipeline and one associated pipeline installation. The purpose of the pipeline would be to transport crude oil from Terasen’s existing Scotford South Pump Station, located at Legal Subdivision (LSD) 7, Section 31, Township 55, Range 21, West of the 4th Meridian, to the Trans Mountain Pipeline Terminal near Edmonton, located at SE 5-53-23W4M. The proposed pipeline would be about 43 kilometres (km) in length, with an outside diameter (OD) of 508 millimetres (mm). The associated pipeline installation would be an addition to Terasen’s existing Scotford South Pump Station located at LSD 7-31-55-21W4M. The applications are currently under review with the EUB to determine technical completeness.
Additional Information
To obtain additional information or a copy of the application, contact
Terasen Pipelines (Corridor) Inc.
c/o Kinder Morgan Canada Inc.
Suite 2700, 300 – 5 Avenue SW
Calgary, Alberta T2P 5J2
Attention: Peter Forrester, Senior Legal Counsel
Telephone: (403) 514-6643
Fax: (403) 514-6622
A copy of the application is available for viewing at the following EUB offices:
EUB Information Services
Main Floor, 640 – 5 Avenue SW
Calgary, Alberta T2P 3G4
Telephone: (403) 297-8190
EUB St. Albert Field Centre
Main Floor, 30 Winston Churchill Avenue
St. Albert, Alberta T8N 3A3
Telephone: (780) 460-3800
For information about EUB procedures, contact
Applications Branch, Facilities Applications Group
Attention: Phil Didow
Telephone: (403) 297-8103
Fax: (403) 297-4117
E-mail: phil.didow@gov.ab.ca
To File a Submission
If you have an interest in this application and you wish to file a submission, please state in writing your reasons for filing by no later than September 22, 2006. Send one copy of your submission to the applicant at the name and address above and another copy to
Phil Didow, Applications Coordinator
Applications Branch, Facilities Applications Group
Alberta Energy and Utilities Board
640 – 5 Avenue SW
Calgary, Alberta T2P 3G4
Notes
Any submission filed shall contain the following:
(a) a concise statement indicating
(i) the manner in which the intervener’s rights may be directly and adversely affected by a decision of the Board on the proceeding,
(ii) the nature and scope of the intervener’s intended participation,
(iii) the disposition of the proceeding that the intervener advocates, if any,
(iv) the facts the intervener proposes to show in evidence,
(v) the reasons why the intervener believes the Board should decide in the manner that the intervener advocates, and
(vi) the intervener’s efforts, if any, to resolve issues associated with the proceeding directly with the applicant;
(b) the name, address in Alberta, telephone number, fax number and, if available, e-mail address of the intervener;
(c) if the intervener is represented by a representative, the name, address in Alberta, telephone number, fax number and, if available, e-mail address of the representative; and
(d) if the intervener is an unincorporated organization, the nature of the intervener’s membership.
If you have an interest in this matter, you are required to make a submission with respect to this application even if you have previously filed a submission with the Board or with Terasen on this application.
Submissions relating exclusively to compensation for land usage are not dealt with by the EUB but may be referred to the Alberta Surface Rights Board.
Note: In accordance with Section 12 of the Alberta Energy and Utilities Board Rules of Practice, all documents filed in respect of this proceeding must be placed on the public record unless otherwise ordered by the Board.
Issued at Calgary, Alberta, on August 23, 2006.
ALBERTA ENERGY AND UTILITIES BOARD
Douglas A. Larder, Q.C., General Counsel
