NOTICE OF APPLICATION
MINNEHIK-BUCK LAKE AND PEMBINA AREAS
APPLICATION NO. 1308807
BONTERRA ENERGY CORP.
Take Notice
that the Alberta Energy and Utilities Board (EUB) may continue to process this application without further notice if no submissions for or against are received with respect to Application No. 1308807 on or before
December 23, 2003
.
Nature of the Application
Fekete Associates Inc., on behalf of Bonterra Energy Corp., has applied under the
Oil and Gas Conservation Regulations
and the
Oil and Gas Conservation Act
to establish drilling spacing units of one half section, being either the east or west half of the section, with target areas being the southwest or northeast quarter of the section, in accordance with Section 4.030 1(b), for the production of gas from the Edmonton Coals in the following areas:
IN TOWNSHIP 46, RANGE 7, WEST OF THE 5th MERIDIAN:
Sections 19 and 30
IN TOWNSHIP 46, RANGE 8, WEST OF THE 5th MERIDIAN:
Sections 25 and 26
IN TOWNSHIP 47, RANGE 7, WEST OF THE 5thM ERIDIAN:
Sections 1, 12, and 36
IN TOWNSHIP 47, RANGE 8, WEST OF THE 5th MERIDIAN:
Sections 6 and 7
IN TOWNSHIP 48, RANGE 7, WEST OF THE 5th MERIDIAN:
Sections 10, 24, and 25
IN TOWNSHIP 49, RANGE 7, WEST OF THE 5th MERIDIAN:
Section 12
The applicant has further applied to establish drilling spacing units of one half section, being either the north or south half of the section, with target areas being the southwest or northeast quarter of the section, in accordance with Section 4.030 1(b), for the production of gas from the Edmonton Coals in the following areas:
IN TOWNSHIP 46, RANGE 7, WEST OF THE 5th MERIDIAN:
Sections 33, 34, and 35
IN TOWNSHIP 46, RANGE 8, WEST OF THE 5th MERIDIAN:
Sections 13, 34, and 35
IN TOWNSHIP 46, RANGE 9, WEST OF THE 5th MERIDIAN:
Section 35
IN TOWNSHIP 47, RANGE 7, WEST OF THE 5th MERIDIAN:
Sections 5, 19, and 22
IN TOWNSHIP 47, RANGE 8, WEST OF THE 5th MERIDIAN:
Sections 1 and 2
IN TOWNSHIP 47, RANGE 9, WEST OF THE 5th MERIDIAN:
Sections 1 and 2
IN TOWNSHIP 48, RANGE 5, WEST OF THE 5th MERIDIAN:
Section 4
IN TOWNSHIP 49, RANGE 6, WEST OF THE 5th MERIDIAN:
Section 8
The applicant has further applied to establish holdings for the production of gas from the Edmonton Coals in the areas shown on the following Appendix.
The applicant proposes that within all holdings shown on the Appendix:
a producing well shall be at least 200 metres from each other well producing from the
same pool, and
a producing well shall be at least 150 metres from the boundary of the holding.
Additional Information
To obtain additional information or a copy of the application, contact:
Fekete Associates Inc.
2000, 540 5 Avenue SW
Calgary, Alberta T2P 0M2
Attention: Robyn Swanson
Telephone: (403) 213-4250
A copy of the application is available for viewing at the following location:
Alberta Energy and Utilities Board
Information Services
1st Floor, 640 5 Avenue SW
Calgary, Alberta T2P 3G4
For information regarding EUB procedures, contact:
Applications Branch, Resources Applications
Natalie Griffiths, Telephone: (403) 297-3554
natalie.griffiths@gov.ab.ca
To File A Submission
Any person intending to make a submission with respect to Application No. 1308807 shall file on or before
December 23, 2003
. Send one copy of your submission to the applicant at the name and address above and three copies of the submission to:
Natalie Griffiths
Alberta Energy and Utilities Board
Applications Branch, Resources Applications
640 - 5 Avenue SW
Calgary, Alberta T2P 3G4
Notes
The application applies to the subsurface placement of wellbores where they enter the productive part of the pool. It does not include the approval of or imply approval of wellsite locations or access. These are matters to be negotiated between the applicant and the surface rights owner.
Issued at Calgary, Alberta, on November 28, 2003.
ALBERTA ENERGY AND UTILITIES BOARD
Michael J. Bruni, Q.C., General Counsel