BITUMEN CONSERVATION REQUIREMENTS PROCEEDING NO. 1347905, UNDER BITUMEN CONSERVATION REQUIREMENTS ATHABASCA WABISKAW-MCMURRAY AREA
This page provides access to documents filed with or issued by the Board in relation to Phase 3 Proceedings (Final - Proceeding 1347905) under the Board's Bitumen Conservation Requirements affecting Gas Production in Oil Sands Areas
PRELIMINARY MATTERS
Bulletin 2006-45: Pressure Testing Requirements - Athabasca Wabiskaw-McMurray (December 19, 2006)
Decision 2005-122 Addendum Phase 3 Final Proceeding Under Bitumen Conservation Requirements in the Athabasca Wabiskaw-McMurray Proceeding 1347905 Tables (Excel)
Decision 2005-122 Phase 3 Final Proceeding Under Bitumen Conservation Requirements in the Athabasca Wabiskaw-McMurray Proceeding 1347905
Decision 2004-088 Phase 3 Final Proceeding Under Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray – Prehearing Meeting Decision (October 14, 2004)
Notice of Hearing
Requests and Submissions to EUB Regarding Preliminary Matters
- Letter dated July 12, 2004, from SSG to EUB
- Letter dated July 23, 2004, from SSG to EUB
- Letter dated August 6, 2004, from Paramount Energy Trust to EUB
- Letter dated August 6, 2004, from Thackray Burgess on behalf of CNRL to EUB
- Letter dated August 5, 2004, from Fraser Milner Casgrain LLP on behalf of BP Canada to EUB
- Letter dated April 11, 2005 from SSG to Board re attachments to Information Request Responses
- Letter dated April 13, 2005 from Paramount re information availability
- Letters dated May 26, 2005 in response to EUB letter of May 20, 2005 regarding timing at the hearing
- Letter dated June 7, 2005 from Paramount
- Letter dated June 7, 2005 from EnCana re EnCAID
EUB Responses to Preliminary Matters Raised
- Letter dated July 29, 2004, from EUB to Interested Parties
- Letter dated September 3, 2004, from EUB to Interested Parties
- Letter dated February 1, 2005, from EUB to all Parties re filing and serving of material in the Phase 3 Final Hearing
- Letter dated February 1, 2005 to CNRL adding new production application (1341347) and CNRL letter of February 4, 2005 withdrawing the application
- Letter dated February 17, 2005, from EUB to all Parties re request from EUB Staff Submission Group
- Letter dated March 2, 2005 re SSG request for leave
- Letter dated March 2, 2005 re Phase 3 hearing schedule
- List of Interested Parties
- List of Counsel
- Letter dated March 22, 2005 to L. Sali re scheduling of witnesses
- Letter dated March 28, 2005 to parties re SSG request of March 24, 2005
- Letter dated April 8, 2005 to parties re SSG request for leave
- Letter dated April 11, 2005 to parties re SSG request of April 11, 2005
- Letter dated April 28, 2005 to SSG re filing of responses to information requests
- Letter to Parties May 20, 2005 to parties re: Hearing
- Letter to Parties Jun 6, 2005 re order at hearing
- Letter to LM Sali dated June 7, 2005 in response to letter of June 7 from L Sali on behalf of Paramount
- Letter dated June 13, 2005 - List of Exhibits
- Letter to all parties dated June, 17, 2005 re PEOC
- Letter to Paramount dated June 28, 2005 [PDF-35KB]
- Letter dated July 20, 2005 from G. Perkins to all interested parties Re: Hearing Resumption[PDF:142KB]
- Letter dated July 29, 2005 To parties Re: Hearing resumption [PDF:140 KB]
- Letter dated Aug 4, 2005; C. Morin Re: Paramount Resources policy statement [PDF:142 KB]
- Letter dated Aug 8, 2005 to L. Sali re: reasons [PDF:36 KB]
- Phase 3 Final Hearing Arguement [zip: 100 KB]
SUBMISSIONS TO FINAL HEARING
Note: Many of the submissions to the final hearing are too large to be available on the web site. For your convenience, we have created an FTP site at ftp://ftp.eub.ca. All submissions for the final hearing are available on the FTP site. Please note that some of the files are extremely large and downloading may be quite slow. The submissions are listed below, with an indication of which files are only accessible on the FTP site.
BP Canada Energy Company
Board Staff
Canadian Natural Resources Limited
Devon Canada Corporation
EnCana Corporation
Letter to EUB dated June 7, 2005 [PDF - 469 KB]
Exhibit E-3 Letter to EUB dated Aug 10, 2005 [PDF - 34 KB]
ISH Energy Ltd.
Japan Canada Oil Sands Limited
Nexen Inc.
- Submission, Feb 14, 2005 [PDF - 85 KB]
- Appendix 1 - T84 R7 W4M Core Photos [available on FTP server only at ftp://ftp.eub.ca]
- Appendix 2 - T85 R6 W4M Core Photos [available on FTP server only]
- Appendix 3 - T85 R7 W4M Core Photos [available on FTP server only]
- Appendix 4 - T86 R6 W4M Core Photos [available on FTP server only]
- Appendix 5 - T86 R7 W4M Core Photos [available on FTP server only]
- Appendix 6 - T87 R7 W4M Core Photos [available on FTP server only]
- Appendix 7 [PDF - 250 KB]
- Table [PDF - 25 KB]
- Submission, Feb 22, 2005 - re filing of response submissions and scheduling of hearing [PDF - 25 KB]
- Information Requests by Nexen (to Paramount) [PDF - 456 KB]
- Information Request Responses by Nexen
- Information Request by Nexen - to Paramount - Clarification (Apr 22, 2005) [PDF - 16 KB]
- Response Submission, May 9, 2005 [PDF - 532 KB]
- Reply Submission, May 20, 2005 [PDF - 600 KB]
- Letter to EUB dated June 24, 2005 [PDF - 14 KB]
- Exhibit H-7 Nexen PEOC Geostat Pool Study Map [PDF - 474 KB]
- Exhibit H-8 Nexen Map of McMurray A2 and B2 Mudstone [PDF - 1770 KB]
- Exhibit H-9 Nexen McMurray Formation Paper By Ranger and Pemberton [PDF - 1584 KB]
- Exhibit H-10 Nexen Map Showing Wells from Nexen IR and Response Submission [PDF - 513 KB]
- Exhibit H-11 Nexen 2-D Slice Through Well 5-35-80-10W4 [PDF - 328 KB]
- Exhibit H-12 Log for Well 10-11-81-10W4 [PDF - 69 KB]
- Exhibit H-13 Nexen Petrel Software Figure for Well 10-11-81-10W4 [PDF - 404 KB]
- Exhibit H-14 Nexen Excerpt from Surmount Producers Gorup Evidence [PDF - 26 KB]
Paramount Energy Operating Corp.
- Submission Cover Letter Feb 14, 2005 [PDF - 306 KB]
- Errata to submission [PDF - 26 KB]
- Corner McMurray C Pool
- Main report [PDF - 4267 KB]
- Appendix 1 Cross sections and pool schematic [available on FTP server only at ftp://ftp.eub.ca]
- Appendix 2 RGS mapping [PDF - 1000 KB]
- Appendix 3 Pool pressures and production plots [Zip - 22602 KB]
- Appendix 4 Seismic lines and velocity [PDF - 18 KB]
- Appendix 5 Core SAME AS HANG X [available on FTP server only]
- Appendix 6 Facies profiles of wells [available on FTP server only]
- Appendix 7 Log analysis answer plots [PDF - 2178 KB]
- Appendix 8 Geomodel report [PDF - 2298 KB]
- Appendix 9 EUB pool net pay maps [PDF - 475 KB]
- Appendix 10 Simulation data [available on FTP server only]
- Corner McMurray G Pool
- Main report [PDF - 4205 KB]
- Appendix 1 Cross sections and pool schematic [available on FTP server only at ftp://ftp.eub.ca]
- Appendix 2 RGS mapping [PDF - 1000 KB]
- Appendix 3 Pool pressures and production plots [Zip - 26628 KB]
- Appendix 4 Seismic lines and velocity [PDF - 18 KB]
- Appendix 5 Core SAME AS HANG X [available on FTP server only]
- Appendix 6 Facies profiles of wells [PDF - 151 KB]
- Appendix 7 Log analysis answer plots [PDF - 2393 KB]
- Appendix 8 Geomodel report [PDF - 2562 KB]
- Appendix 9 EUB pool net pay maps [PDF - 481 KB]
- Appendix 10 Simulation data [available on FTP server only]
- Hangingstone McMurray KKK Pool
- Main report [PDF - 3183 KB]
- Appendix 1 Cross sections and pool schematic [available on FTP server only at ftp://ftp.eub.ca]
- Appendix 2 RGS mapping [PDF - 1000 KB]
- Appendix 3 Pool pressures and production plots [Zip - 5184 KB]
- Appendix 4 Seismic lines and velocity [PDF - 18 KB]
- Appendix 5 Core SAME AS HANG X [not available on web]
- Appendix 6 Facies profiles of wells [PDF - 30 KB]
- Appendix 7 Log analysis answer plots [PDF - 1791 KB]
- Appendix 8 Geomodel report [PDF - 566 KB]
- Appendix 9 - not submitted
- Appendix 10 Simulation data [available on FTP server only]
- Hangingstone McMurray X and NNN Pool
- Main report [PDF]
- Appendix 1 Cross sections and pool schematic [available on FTP server only at ftp://ftp.eub.ca]
- Appendix 2 RGS mapping [PDF - 1000 KB]
- Appendix 3 Pool pressures and production plots [Zip - 12173 KB]
- Appendix 4 Seismic lines and velocity [PDF - 18 KB]
- Appendix 5 Core SAME AS HANG X [not available on web]
- Appendix 6 Facies profiles of wells [PDF - 130 KB]
- Appendix 7 Log analysis answer plots [PDF - 1791 KB]
- Appendix 8 Geomodel report [PDF - 2980 KB]
- Appendix 9 EUB pool net pay maps [PDF - 426 KB]
- Appendix 10 Simulation data [available on FTP server only]
- Hardy Wabiskaw McMurray A Pool
- Submission, Feb 22, 2005 - re filing of response submissions and scheduling of hearing
- Information Requests by Paramount (Mar 21, 2005)
- Information Request Responses by Paramount
- Response Submission, May 9, 2005 [PDF - 35 KB]
- Reply Submission (to Nexen), May 20, 2005 [PDF - 563 KB]
- Reply Submission (to PetroCanada), May 20, 2005 [PDF - 744 KB]
- Exhibit I-16 Annual Resource Management Report [PDF- KB]
- Exhibit I-17 ID202-03 [PDF - 131 KB]
- Exhibit I-18 MacKay River 2004 Performance Presentation [PDF - 59499 KB]
- Exhibit I-19 Logs for wells 16-10 and 2-9 [PDF - 1155 KB]
- Exhibit I-20 Comparison Table C, G, and X Pools [PDF - 29 KB]
- Exhibit I-21 Tables A1 Geological Models Data C and G Pools [PDF - 28 KB]
- Exhibit I-22 Bundle of 6 Logs [PDF - 585 KB]
- Exhibit I-23 Long Lake Presentation [PDF - 21252 KB]
- Letter to EUB dated June 23, 2005 [PDF - 12 KB]
- Paramount June 24, 2005 Presentation Slides
- Exhibit I-29 PEOC Correction Slides for Introduction [PDF - 1390 KB]
- Exhibit I-33 PEOC Hardy presentation [PDF - 1691 KB]
- Exhibit I-34 PEOC 3 Additional Slides for Hardy [PDF - 624 KB]
- Exhibit I-35 PEOC Undertaking Response - CoKriging [PDF - 55 KB]
- Exhibit I-36 PEOC - Undertaking Response - Model Runs by Dr. Ali [PDF - 56 KB]
- Exhibit I-37 PEOC - Undertaking Response BottomHole Pressure Runs [PDF - 34 KB]
- Exhibit I-38 PEOC Revised Table 6 [PDF - 27 KB]
- Exhibit I-39 PEOC Kv-kh Plot for Well 11-19-81-9W4 [PDF - 15 KB]
- Exhibit I-40 PEOC Run3.1B-600C and Attachments [PDF - 2481 KB]
- Letter to EUB dated July 12, 2005 [PDF - 357 KB]
- Letter to EUB dated July 19, 2005 [PDF - 41 KB]
- Reply to PetroCanada plots - Final June 09, 05
- Undertaking Response July 25, 2005 [ZIP - 5 MB]
- Letter dated July 27, 2005 from Paramount to G Perkins Re: Timing [PDF - 32 KB]
- Undertaking Response Aug 5, 2005 [ZIP - 3.3 MB]
- Letter dated Aug 2, 2005 - Bennett Jones to EUB [PDF - 203 KB]
Paramount Resources
Petro-Canada
- Petro-Canada Submission [PDF - 26159 KB]
- Submission, Feb 22, 2005 - re filing of response submissions and scheduling of hearing [PDF 421 KB]
- Information Requests by Petro-Canada (to Canadian Natural Resources Limited, Staff Submission Group and Paramount) (Mar 21, 2005) [PDF - 40 KB]
- Information Request Responses by Petro-Canada
- Response Submission, May 9, 2005 [PDF - 2851 KB]
- Reply Submission, May 20, 2005 [PDF - 1183 KB]
- Reply Submission, May 27, 2005 and Errata [PDF - 1620 KB]
- Exhibit K-12 Evidence Chief Overheads [PDF - 4.5 MB]
- Letter to EUB dated June 23, 2005 [PDF - 14 KB]
- Letter dated Jun 30, 2005 re Paramount Letter [PDF - 26 KB]
- Exhibit K-13 PetroCan Excerpt from Christina Lake Report [PDF - 88 KB]
- Exhibit K-14 PetroCan Excerpt from Surmont Report [PDF - 24 KB]
- Exhibit K-15 PetroCan Package of Materials From PEOC Submissions [PDF - 875 KB]
- Exhibit K-16 PetroCan Comparison of Gas Volumes in Corner C Study [PDF - 22 KB]
- Exhibit K-17 PetroCan [PDF - 3940 KB]
- Exhibit K-18 PetroCan Excerpt from Paramount Submission [PDF - 1222 KB]
- Exhibit K-19 PetroCan Exerpt from Paramount Submission [PDF - 4016 KB]
- Exhibit K-20 PetroCan Well 3-34 Revised Description of Horz and Vert Perm [PDF - 871 KB]
- Exhibit K-21 PetroCan Package of Documents from Paramount Evidence [PDF - 1270 KB]
- Exhibit K-22 PetroCan Paramount Input Data From 3.1A 1900 Generic Model [PDF - 1731 KB]
- Exhibit K-15 PetroCan Facies Log 3-34-80-10W4 [PDF - 1.2 MB]
- Exhibit K-23 Petro Can Cross Examination Package for PEOC [PDF - 1.1 MB]
PrimeWest Energy Inc.
Staff Submission Group (SSG)
- SSG Submission Declaration and Supporting Evidence [PDF - 487 KB]
- Appendix 1 SSG Contested Wells and Intervals [Excel - 113 KB]
- Appendix 2 New Well and Gas Interval Evaluations [Excel - 65 KB]
- Appendix 3 Pressure and Production Data [Zip file - 7394 KB]
- Appendix 4 Wabiskaw D Shale Core Study Photos [PDF - 1242 KB]
- Figures [Zip file - 7714 KB]
- Tables [Zip file - 83 KB]
- Letter (Feb 17, 2005) to EUB re Errata [31 KB]
- Submission - Addendum and Errata [248 KB]
- Submission - Appendix 1 Revised [138 KB]
- Submission, Feb 22, 2005 - re filing of response submissions and scheduling of hearing [PDF - 953 KB]
- Information Requests by Staff Submission Group (to Paramount) (Mar 21, 2005) [PDF - 61 KB]
- Letter (Mar 24, 2005) by SSG requesting leave to file addendum and errata [PDF 41 KB]
- Submission Appendix 1 - SSG Contested Wells and Intervals - Addendum Mar 24, 2005 [Excel - 142 KB]
- Submisson - Addendum and Errata - Mar 24, 2005 - formatted [PDF - 284 KB]
- Submission Appendix 2 - New Well and Gas Interval Evaluations - Addendum Mar 24, 2005 [Excel - 72 KB]
- Letter dated April 11, 2005 from SSG to Board re attachments to Information Request Responses
- Information Request Responses by SSG - April 11, 2005 [PDF - 140 KB]
- Attachment 1 Explanation of Appendices and Supplemental Files [PDF - 36 KB]
- Appendix 1 Core Photos Wabiskaw D Shale Core Study [PDF - 26290 KB] [available on FTP server only at ftp://ftp.eub.ca - under SSG-StaffSubmissionGroup/IR Responses]
- Appendix 2 Log Copies Wabiskaw D Shale Core Study [PDF - 152898 KB] [available on FTP server only at ftp://ftp.eub.ca - under SSG-StaffSubmissionGroup/IR Responses]
- Table 6-1 Supplemental [Excel - 86 KB]
- Figure 6-1 Supplemental [Excel - 24 KB]
- Information Request by SSG to Paramount - Request for Clarification (Apr 20, 2005) [PDF - 34 KB]
- Response Submission (May 9, 2005) [PDF - 95 KB]
- Attachment 1 - Explanation of Appendices [PDF - 29 KB]
- Appendices - all available only on FTP server at ftp://ftp.eub.ca - under SSG-StaffSubmissionGroup/ResponseSubmission
- Reply Submission, May 20, 2005 [PDF - 54 KB]
- Letter to EUB June 20, 2005 [PDF - 31 KB]
- Exhibit M-12 Core Photo 10-9-73-7W4 [PDF - 193 KB]
- Exhibit M-13 Core-Photo 2-30-85-6W4 [PDF - 949 KB]
- Exhibit M-14 Three Bitumen Isopach Maps [PDF - 749 KB]
- Exhibit M-15 Well Test Data 3-21 [PDF - 3 MB]
- Exhibit M-16 Survey Information for Well 12-16 [PDF - 2 MB]
- Exhibit M-17 Comparison of Tables 22A [PDF - 21 KB]
- Exhibit M-18 Coss Section [PDF -74 KB]
- Exhibit M-19 Histogram Plot [PDF - 84 KB]
- Exhibit M-20 SSG Isopach of J Pool and Area Bitumen [PDF - 3952 KB]
- Exhibit M-21 SSG Undertaking for Wells 7-28 and 6-27 [PDF - 733 KB]
- Exhibit M-22 SSG Undertaking on Well 10-14 McMurray B [PDF - 21 KB]
- Exhibit M-23 SSG Package Taken from Paramount's Evidence [PDF - 2937 KB]
- Exhibit M-24 SSG Excerpts from Clayton Deutsch [PDF - 921 KB]
- Exhibit M-25 SSG Package of Well Logs [PDF - 15269 KB]
- Exhibit M-26 SSG Comparison of CSS and SAGD Performance [PDF - 920 KB]
- Exhibit M-27 SSG Paper on Flue Gas Injection in Dover [PDF - 558 KB]
- Exhibit M-28 SSG - Encana Letter of Feb 2, 2005 [PDF - 50 KB]
- Exhibit M-29 SSG Package of Cross Examination Materials [PDF - 11050 KB]
- Exhibit M-30 SSG Paper by David Payne [PDF - 705 KB]
- Exhibit M-31 SSG Well Test [PDF - 9 KB]
- Exhibit M-32 SSG Undertaking Response to Board Staff [PDF - 30 KB]
- Letter to EUB July 14, 2005 Re: PEOC and Judicial Review [PDF - 30KB]
- Letter dated July 27, 2005 to EUB Re: PEOC Response to Undertakings [PDF - 30 KB]
Stylus Exploration Inc.
PREHEARING
Decision 2004-088 Phase 3 Final Proceeding Under Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray – Prehearing Meeting Decision (October 14, 2004)
Notice of Pre-Hearing Meeting
PREHEARING SUBMISSIONS (in alphabetical order by company)
BP Canada
Canadian Natural Resources Limited
Chipewyan Prairie First Nation
ConocoPhillips
Devon
EnCana Corporation
Husky Oil Operations Limited
ISH Energy
Nexen Canada Ltd.
Paramount Resources
Paramount Energy Trust
Petro-Canada
PrimeWest Energy Inc.
Staff Submission Group (SSG)
Stylus Exploration Inc.
|