 |
NOTICE OF APPLICATION ATHABASCA OIL SANDS AREA ALBERTA ENERGY AND UTILITIES BOARD APPLICATION NO. 1445535
ALBERTA ENVIRONMENT ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT APPLICATION NO. 001-228044 WATER ACT FILE NO. 00228047 ENVIRONMENTAL IMPACT ASSESSMENT REPORT
DEER CREEK ENERGY LIMITED JOSLYN NORTH MINE PROJECT
Take Notice that Deer Creek Energy Limited (DCEL) has made an application to the Alberta Energy and Utilities Board (EUB) and Alberta Environment (AENV) for approval to construct, operate, and reclaim an oil sands surface mine and bitumen extraction facilities in the Fort McMurray area. The proposed mining project is to be located approximately 70 kilometres north of Fort McMurray on Oil Sands Leases 7280060T24, 7404110452 and 7405070799 in Townships 94, 95, 96, Ranges 11 to 13, West of the 4th Meridian. The proposed development includes an open pit, truck and shovel mine, ore handling facility, bitumen extraction facilities, tailings processing facilities, support infrastructure, water and tailings management plans, and an integrated reclamation plan. The Joslyn North Mine project is designed to produce a total of 15,900 cubic metres per day (100,000 barrels per day) of bitumen. The proposed project would be constructed in two phases each designed to produce 7,950 cubic metres per day (50,000 barrels per day) of bitumen. Construction of the proposed project, if approved, could begin in 2007.
Nature of the Application In support of the proposal, DCEL has prepared and submitted the following:
- Application No. 1445535 to the EUB pursuant to Sections 10 and 11 of the Oil Sands Conservation Act for authorization to construct, operate and reclaim an oil sands mining, and bitumen extraction facility, the Joslyn North Mine Project.
- Application No. 001-228044 to AENV under the Environmental Protection and Enhancement Act (EPEA) for construction, operation and reclamation of the Joslyn North Mine Project.
- Application (File No. 00228047) to AENV pursuant to Sections 37 and 50 of the Water Act to authorize water management plans associated with the construction, operation and reclamation of the Joslyn North Mine Project, including the diversion up to a maximum of 10,617,000 cubic metres per year from surface runoff, groundwater dewatering (non-saline water), and the Athabasca River for industrial purposes.
The application shares a common Environmental Impact Assessment (EIA) report which DCEL has prepared and submitted to the Director, Environmental Assessment, Northern Region. The EIA report forms part of the application to the EUB.
Additional Information To obtain additional information or a copy of the applications and the EIA report, free of charge, contact:
Deer Creek Energy Limited Dome Tower Suite 1900, 333 - 7 Avenue SW Calgary, AB T2P 2Z1 Attention: Ray Reipas, Vice President Mining Telephone: (403) 571-7599 or 1-866-371-7599 Fax: (403) 264-3700 Email: TEPC.Communication@total.com Website: www.deercreekenergy.com
For information regarding EUB procedures contact: Fort McMurray Office Brad Bricker Telephone: (780) 743-7487 Fax: (780) 743-7141 Email: brad.bricker@gov.ab.ca
Copies of the application and the EIA report are available for viewing at the following locations:
Alberta Energy and Utilities Board Fort McMurray Office 2nd Floor, Provincial Building 9915 Franklin Avenue Fort McMurray, Alberta T9H 2K4
Alberta Energy and Utilities Board Information Services, Calgary Office Main Floor, 640 - 5 Avenue SW Calgary, Alberta T2P 3G4 Telephone (403) 297-8190
Oil Sands Discovery Centre 515 MacKenzie Boulevard Fort McMurray, Alberta T9H 4X3
Register of Environmental Assessment Information Alberta Environment 111 Twin Atria Building 4999 - 98 Avenue Edmonton, Alberta T6B 2X3 Attention: Melanie Daneluk
Fort McMurray Public Library 9907 Franklin Avenue Fort McMurray, Alberta T9H 2K4
Fort McKay First Nations Band Office Fort McKay, Alberta,
Deer Creek Energy Limited Website www.deercreekenergy.com Stakeholders / Consultation & Regulatory Affairs
To File a Statement of Concern
Under Section 73 of EPEA and Section 109 of the Water Act, any person who is directly affected by the EPEA Applications or the Water Act Application may submit a written statement of concern. Statements of concern under EPEA and Water Act must be submitted by May 29, 2006. Failure to file a statement of concern may affect the right to file a Notice of Appeal with the Environmental Appeal Board. Please quote Application No. 001-228044 (EPEA), or File No. 00228047 (Water Act) when submitting a statement of concern. If no statements of concern are received, the EPEA and Water Act Applications may be approved without further notice. Please submit your statement to:
Director, Northern Region Alberta Environment Regulatory Approvals Centre 5 Floor, Oxbridge Place 9820 - 106 Street Edmonton, Alberta T5K 2J6 Telephone: (780) 427-6311 Fax: (780) 422-0154
Note that any statements filed regarding these applications are public records, which are accessible by the public.
This notice of Application is being distributed to advise interested persons that the applications are available and the EUB and other government Departments are now undertaking review of the application.
Issued at Calgary, Alberta, on February 16, 2006.
ALBERTA ENERGY AND UTILITIES BOARD Douglas A. Larder, General Counsel
|
Page Last Updated: February 16, 2006 |
|