Bitumen Conservation Requirements Affecting Gas Production in the Athabasca Oil Sands Area
Sunshine, Athabasca, Total and Paramount Applications for Shut-in or Production of Gas (Applications No. 1613543, 1647807, 1616123 and 1506272)
Canadian Natural Resources Limited Pool Delineation Application and Shut-in Request (Application No. 1576629)
Paramount Experimental Gas Storage Scheme and Review and Variance Applications (Applications No. 1494136 and 1580112)
Athabasca Phase 3 Proceedings
Important Notice Regarding the Athabasca Wabiskaw-McMurray - October 6, 2004, regarding SSG's access to EUB's database relating to the Wabiskaw-McMurray area.
Letter dated March 8, 2004 "Board Initiated Review Related to Wells with Wabiskaw-McMurray Perforated Intervals Approved for Gas Production or Not Required to be Shut In, under EUB Decision 2003-23, Chard Area and Leismer Field, Athabasca Oil Sands Area"
News Release 2004-01-02 (NR 2004-01) plus Backgrounders and Letter from EUB Chairman: EUB Releases Regional Geological Study
Report 2003-A: Athabasca Wabiskaw-McMurray Regional Geological Study
Note: The PDF file of the study is approximately 19 MB.
For your convenience, we are also making it available separated into 9 smaller parts that will be easier to download or print: Zip file of all parts that you can download - OR -
Part 1 ; Part 2 ; Part 3 ; Part 4 ; Part 5 ; Part 6 ; Part 7 ; Appendix A ; Appendix B1 & B2
News Release 2003-12-17 (NR 2003-49): Bitumen Conservation Requirements Next Steps Announced (December 17, 2003)
Monthly Status Letter on Bitumen Conservation Requirements from the EUB Chairman including Attachment - Letter on Phase 3 Bitumen Conservation Requirements (December 17, 2003)
Paramount Energy submission respecting the Regional Geological Study (December 15, 2003)
- Letter Hangingstone McMurray G Pool Corner McMurray A Pool Corner McMurray N Pool Cross Section 1 Cross Section 2 Cross Section 3
Petro-Canada Submission respecting the Regional Geological Study (November 2003)
(added Nov 24, 2003)
Letter Report Figure 1 Figure 2
Decision 2003-080 Stylus Exploration Inc. Application for Approval to Produce Gas Hardy Field (Applications No. 1095525, 1095526, 1095602, and 1275288) (Released: Nov 4, 2003)
Monthly Status Letter from EUB Chairman on Bitumen Conservation Requirements (November 2003)
Letter (October 9, 2003) from EUB Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray Pressure Data Collection
Monthly Status Letter from EUB Chairman on Bitumen Conservation Requirements (October 1, 2003)
Letter from EUB (September 30, 2003) "Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray Pressure Data Collection"
Monthly Status Letter from EUB Chairman on Bitumen Conservation Requirements (September, 2003) (Industry Support for EUB Regional Geological Study)
Letter (September 5, 2003) - Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray Regional Geological Study
Procedural Direction Phase II - Expedited Review of Exemptions Proceedings (August 22, 2003)
EUB Letter (August 22, 2003) regarding pressure data collection requirement
EUB Letter (August 22, 2003) regarding Interim Shut In Order 03-001
EUB Letter (August 15, 2003) regarding Interim Shut In Order 03-001
News Release 2003-07-22: EUB Issues Comprehensive Bitumen Conservation Requirements (NR 2003-32)
General Bulletin GB 2003-28: Bitumen Conservation Requirements Athabasca Wabiskaw-McMurray (released July 22, 2003) (contains ID 99-01 Amendment: Fourth Amendment to ID 99-1)
Exemption Notifications Filed with the EUB (File last updated: April 19, 2004)
Excel format or PDF format
Activity Summary Table (File reviewed weekly: Changes from June 22, 2004; Reviewed to August 31, 2004)
Excel format or PDF format
Media Advisory 2003-06-30: EUB To Hold Consultation Meeting on Proposed Bitumen Conservation Policy (NR 2003-29)
EUB Letter regarding Public Consultation Meeting regarding conservation policy for gas production in Oil Sands Areas (Mtg to be held July 3-4, 2003)
Submissions in response to GB 2003-16 (submission deadline June 26, 2003)
General Bulletin GB 2003-16: Proposed Conservation Policy Affecting Gas Production in Athabasca Wabiskaw-McMurray Oil Sands Areas (June 3, 2003)
News Release 2003-06-03 (NR 2003-27): Consultation Continues on Proposed Conservation Policy Affecting Gas Production in Athabasca Wabiskaw-McMurray Oil Sands Areas (June 3, 2003)
Submissions in response to GB 2003-12 (submitted in May 2003)
General Bulletin GB 2003-12: Gas Production in Oil Sands Areas (April 3, 2003)
EUB Decision 2003-023: Chard Area and Leismer Field, Athabasca Oil Sands Area: Applications for the Production and Shut-In of Gas -- A number of applications related to the production and shut-in of gas from the Wabiskaw-McMurray Formation in the Chard/Leismer area (March 18, 2003)
EUB Decision 2000-22: Gulf Canada Resources Limited Request for the Shut-In of Associated Gas, Surmont Area -- An application by gulf Canada Resources Limited for the shut-in or gas production from the Wabiskaw-McMurray Formation in the Surmont Area (March 30, 2000)
Rescinding Order to Produce Documents, Proceeding 960952, dated February 15, 2007